About business
Business
We work to protect the local environment by pursuing and considering new roles for the land after demolition.
Demolition of a house
Interior demolition
Restoration of store
Interior demolition
Demolition of block wall
Restoration of office
Interior demolition
Other demolition
Required Period
所要期間について
The time required for demolition depends on the building structure, shape, size, land configuration, and neighborhood conditions. For steel and reinforced concrete buildings, the estimated time is 3 weeks to 1 month; for wooden houses, the estimated time is about 2 weeks. This may be affected by weather conditions.
Demolition Flow
解体工事の流れ
01
On-site survey
02
Create a quote
03
Contract
04
Neighbor greetings
05
Submit documents to government office
01
Investigation/Application
調査 / 申請
We will conduct a site survey and provide an estimate. After signing a contract, construction will begin. Before construction, we will visit the neighborhood to greet the neighbors before the start of construction.
06
removal and disposal
07
Temporary scaffolding/curing assembly work
08
Bring in heavy equipment
09
Asbestos removal
10
Manual removal of building interior
11
Demolition of Buildings
02
Construction begins
着工
We will work with safety as our first priority. We will work with care and attention to dust and noise. If asbestos is found, we will take appropriate measures.
12
Removal of foundation part
13
Removal of external structures
14
Transportation and disposal of waste
15
Land leveling
16
Lost registration
03
Removal and land leveling
撤去と整地
Waste from the demolition work will be disposed of and recycled appropriately.
After the demolition work is completed, we will clear the land and register the loss to complete the work.